Compliance and Verification program system preparation guide

Version history

Date Ver. Author Comment
2017-04-25 0.0.1 Chris Price Draft version

Introduction

This system preparation guide provides a detailed outline of the needed system prerequisites and expectations for running OPNFV evaluation testing.

Test planning and preparation

https://jira.opnfv.org/browse/DOVETAIL-384

Give an outline of the planning phase.

Pre-requisites

Describe what needs to be in place before starting.

Required Infrastructure, connectivity needs, LF & CVP accounts and any additional security or peripheral needs. Use sub-chapters for instance for any accounts etc that need to be created.

Preparing the virtualisation infrastructure

Briefly state what will be tested as an intro, then outline the required system state to be achieved prior to running the tests.

Preparing the test staging host system

https://jira.opnfv.org/browse/DOVETAIL-385

What is required from the system running the CVP test suites?

Required network configuration

https://jira.opnfv.org/browse/DOVETAIL-386

VLAN configurations required for NFV deployments. Non-VLAN configurations if needed.

Preparing your system for CVP testing

https://jira.opnfv.org/browse/DOVETAIL-387

Describe how to realise the “Pharos ready state” and the “Software ready state” in this section.