<Project> post installation procedures

Add a brief introduction to the methods of validating the installation according to this specific installer or feature.

Fuel post installation procedures

Automated post installation activities

Fuel provides a fairly broad coverage of built in automated health checks. These validates the installation in terms of configuration, services, networking, storage, policies, etc. The evecution of the full range of health checks takes less than 30 minutes. For instructions on how to run helthchecks, please refer to the installation instructions: <TODO>

<Project> post configuration procedures

Consult the feature sections in this document for any post-install feature specific configurations.

Platform components validation

Consult the feature sections in this document for any post-install feature specific validation/health-checks.